| Service | Per Ft | Min 30′ | Service |
|
| Haul out and launch | $5.50 | $165.00 | Set up workyard | Up to 35′ $195.00 |
| Load on/off trailer | $5.00 | $150.00 | Set up workyard | 35′ and up $225.00 |
| Haul out to trailer | $8.00 | $200.00 | Re-blocking | $150.00 Minimum |
| Trailer to trailer | $7.00 | $210.00 | All sailboats | Add 25% |
| Load off and splash | $6.00 | $180.00 | Scraping | $75.00 Minimum |
| Pressure cleaning | $2.75 | $85.00 | Forklift | $75.00 Minimum |
| Hurricane tie down | Flat Rate | $185.00 | Shrink wrap | $15.00 X Length |
| Surcharge | Flat Rate | $85.00 | EPA disposal fee | $1.00/ft per month |
| Haul and hang $185.00 1st Hour, $85 every 1/2 hour | ||||
| General labor rate $75.00 per hour, Mechanical labor rate is based upon job | ||||
| Work yard lay-dates $20.00 per day minimum to 30′. 30′ and up $0.68/ft per day | ||||
| Dockage $9.75 per ft per month. Minimum 29′ $280.00 per month | ||||
| Dry storage: up to 30′ $250.00/mo, 31′-40′ $300/mo, 41′-50′ $350/mo, 51′-up $425/mo | ||||
Bottom Painting and Workyard Policies
- All bottom paint and materials for below the waterline must be purchased through our ships store and will be added to your invoice or will be charged a 25% M.S.R.P. surcharge fee.
- All workers other than owner, captain & household members must pay $25 per day per person.
- All subcontractors must have insurance and pay % of job or $25 per person T.B.D. by office.
- All yard invoices must be paid in full before launch. Cash, Visa and Mastercard are the only accepted forms of payment prior to launch.
- Yard invoices must be paid in full at the end of every month.
Bottom Services
Complete Job Includes:
- Haul and Launch
- Pressure Clean
- Yard Setup
- Full Machine Sanding
- One Coat of Bottom Paint
APROX: $36.85 PER FOOT, UP TO 34’ / 35’ UP TO 44’ $ 38.85 PER FOOT 45’ UP TO 50’ $ 40.85 PER FOOT PLUS TAX
(SCRAPING WILL BE EXTRA AND ANY PROBLEM BLISTERS ect.WILL BE QUOTED BEFORE BOTTOM PAINTING IS DONE)
NEW OR TAKEDOWN TO BARE FIBERGLASS
- BARRIER COATING / PRIMERS AND EPOXIES
- LOWER UNITS-CLEAN-ANTI FOUL COATINGS
- SHAFTS & PROPS – STRUTS & TRIM TABS
- ZINC REPLACEMENTS
- RAW WATER INTAKE CLEANING
- MACHINERY COATING ( PROP SPEED-PROP ARMOR- HAWK SPEED-PETTIT )
- 2ND COAT OF ANTI-FOUL PAINT
- BOOT STRIPE RE-DO
- FIBERGLASS REPAIRS REPLACE THRU HULL FITTINGS
- INSTALL UNDERWATER LIGHTS
- INSTALL TRANSDUCERS
| Vac Sander Rental | $60.00 per day |
| Vac Sander Bags | $10.00 each |
| Vac Sander Disc | $2.25 each |
| Basic Bottom Paint Started Kit | $65 each |
| (Two roller covers, 2 liners and metal tray, 3″ brush, 1lb rags, 2 par gloves, dust mask, coverall, 1 gallon alcohol) | |
OUR PROMISE TO OUR CUSTOMERS
WE WILL NOT TOUCH YOUR BOAT UNTIL WE HAVE GIVEN YOU A COMPLETE REPAIR ESTIMATE AND HAVE AGREED ON THE PRICE WITH YOU. WE PROMISE TO HAVE YOUR WORK DONE ON TIME IN BUDGET AND RIGHT THE FIRST TIME!
ALL BOTTOM PAINTS MUST BE PURCHASED FROM OUR STORE. TRINIDAD AND OTHER BOTTOM PAINT AVAILABLE ALSO. $100.00 SURCHARGE APPLIES IF BOTTOM PAINT IS NOT PURCHASED FROM SHIP STORE.
TRASH CANS ARE PROVIDED FOR YOUR CONVENIENCE, MAKE SURE YOU CLEAN UP AFTER YOURSELF OR $75.00 CLEAN UP FEE WILL APPLY
HAZARDOUS WASTE PAINT CANS, ROLLERS & BRUSHES ARE TO BE DISPOSED OF IN PROPER DRUM. SOLVENTS, OILY RAGS & SOLVENTS RAGS ARE TO DISPOSED OF IN PROPER DRUMS. DRUMS ARE LOCATED IN THE CENTER OF WORK YARD BY THE OIL SHACK. FAILURE TO FOLLOW WASTE DISPOSAL RULES WILL RESULT IN $ 100 FINE
ALL SUB-CONTRACTORS MUST CHECK IN WITH OFFICE PRIOR TO ANY WORK BEING DONE MUST HAVE PROOF OF LIABILITY & WC INSURANCE
NO SPRAY PAINTING, PRESSURE CLEANING OR SANDING OR SANDBLASTING ALLOWED
THE MARINA WILL NOT BE RESPONSIBLE FOR DAMAGE TO TAPE BOOT STRIPS OR TAPE GRAPHICS WHILE VESSEL IS BEING PRESSURE CLEANED.
CUSTOMERS SANDING DOWN TO GEL COAT MUST HAVE COMPLETE TARPING/ TENT AROUND VESSEL. SANDING DEBRIS MUST BE VACUUMED BY THE END OF THE DAY. FAILURE TO FOLLOW TARPING RULE WILL RESULT IN A $250.00 FINE
